Service
Announcements

Stay tuned for the latest updates on our services.

January 2025

M1 Maintenance

Date:

21 Jan 2025

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

AMK CO (OLT 7)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

M1 Maintenance

Date:

16 Jan 2025

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

AMK CO (OLT 3)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

8 Jan 2025

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RINSEP ST-QUEEN ST

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Jan 2025

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RINSEP ST-QUEEN ST

Remarks:

All Internet and VoIP services will be affected

December 2024

NetLink Trust Maintenance

Date:

28 Dec 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

Jalan Kayu

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Dec 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

19/21 SELETAR ROAD (807020/807021)

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

24 Dec 2024

Time:

09:00 hrs to 17:00 hrs

Affected Exchanges/Areas:

Jalan Kemaman

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

23 Dec 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

17 SELETAR ROAD S(807019)

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

23 Dec 2024

Time:

09:00 hrs to 17:00 hrs

Affected Exchanges/Areas:

Jalan Kemaman

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

20 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

GERALD DR TO SELETAR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

19 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Yio Chu Kang Rd to Fernvale Rd

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

19 Dec 2024

Time:

09:00 hrs to 15:00 hrs

Affected Exchanges/Areas:

Tanglin Halt

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

17 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Gerald Drive to SENGKANG WEST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

17 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

FERNVALE ROAD TO SENGKANG WEST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

17 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

KALLANG ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Yio Chu Kang Road

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Yio Chu Kang Road

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

12 Dec 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

OC CO ( OLT 3, 5)

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

12 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Yio Chu Kang Road

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

12 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

KALLANG ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

11 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Queen Street

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

11 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ELIAS ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

11 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG WEST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

11 Dec 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

JLN REDOP/KENARAH/BANGAU

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

11 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Queen Street

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

10 Dec 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

OC CO ( OLT 4, 9)

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

10 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

YIO CHU KANG ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

10 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Pasir Ris Dr 3 to Elias Road

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

10 Dec 2024

Time: 

01:00 hrs to 04:00 hrs

Affected Exchanges/Areas:  

Tampines CO  (TPS OLT-02, 04)  

Remarks: 

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

7 Dec 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

711 HOUGANG AVENUE 2

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Lorong Chuan

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

5 Dec 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

ARJ CO  (OLT 4, 5, 10)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window.

NetLink Trust Maintenance

Date:

4 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RINSEP ST-QUEEN ST

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

4 Dec 2024

Time:

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

EST CO (OLT 1 & 3)

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

M1 Maintenance

Date:

3 Dec 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

ORC CO (OLT 3, 5, 9)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

3 Dec 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RINSEP ST-QUEEN ST

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

3 Dec 2024

Time:

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

EST CO (OLT 2 & 5)

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

M1 Maintenance

Date:

2 Dec 2024

Time:

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

EST CO ( OLT 4, 11)

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

November 2024

NetLink Trust Maintenance

Date:

29 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

BLOCKS 227-230 SERANGOON AVENUE 4

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

28 Nov 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

JRW CO ( OLT 7 and 11)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

28 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

BLOCKS 229 & 230 SERANGOON AVENUE 4

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

26 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

1500 EAST COAST PARKWAY NSC S468963

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

BLOCK 230 SERANGOON AVENUE 4

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

26 Nov 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

BKP CO  (OLT 5 & 12)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

25 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

BLOCK 227 SERANGOON AVENUE 4

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

26 Nov 2024

Time:

 09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

BLOCKS 228 & 229 SERANGOON AVENUE 4

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

22 Nov 2024

Time:

 01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

 Queensway to Tanglin Halt Road

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

23 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Queensway to Tanglin Halt Road

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

21 Nov 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

BKP CO  ( OLT 6, 11 & 8)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

20 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

19 Nov 2024

Time:

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

ES CO (OLT 11 and 10)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

M1 Maintenance

Date:

14 Nov 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

BD CO ( OLT 5 and 10)    

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

13 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Queen Street

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

12 Nov 2024

Time:

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

AM CO (OLT 16 and 11)

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

12 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Queen Street

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

8 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BEACH ROAD TO JELLICOE ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

7 Nov 2024

Time:

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

AM CO (OLT 12 and 14)      

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

6 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Queen Street

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

5 Nov 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BEACH ROAD TO JELLICOE ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

5 Nov 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

AM CO (OLT 13 and 21)    

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

5 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

13, 15 CHANGI VILLAGE ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

4 Nov 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas: 

13, 15 CHANGI VILLAGE ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

1 Nov 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas: 

TPS CO  (OLT 3 & 5)   

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

October 2024

NetLink Trust Maintenance

Date:

30 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

30 Oct 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

TPS CO  (OLT 1 & 6) 

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

29 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

29 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

81 PASIR RIS HEIGHTS, S'PORE 519292

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

29 Oct 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

JRW CO  (OLT 4, 5 & 10)   

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

25 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

93-99 PASIR RIS GROVE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

24 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

24 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

93-99 PASIR RIS GROVE

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

24 Oct 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

ARJ CO  (OLT 3 & 10) 

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

23 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

83-91 PASIR RIS GROVE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

22 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

22 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

83-91 PASIR RIS GROVE

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

22 Oct 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

AMK CO (OLT 15, 18 and 22)    

Remarks:

All Internet and VoIP services will be affected.  Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window. Please refer below for the detail.

NetLink Trust Maintenance

Date:

21 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

83-91 PASIR RIS GROVE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

18 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

18 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

94/96/98/100/102/104/106 ELIAS ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

17 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

17 Oct 2024

Time: 

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas: 

ES CO  (OLT 8)

Remarks: 

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window.

NetLink Trust Maintenance

Date:

17 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

94/96/98/100/102/104/106 ELIAS ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

16 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RINSEP ST-QUEEN ST

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

16 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PASIR RIS DR 3 to St 52

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

15 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RINSEP ST-QUEEN ST

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

15 Oct 2024

Time: 

00:00 hrs to 05:00 hrs

Affected Exchanges/Areas: 

ES CO  ( OLT 6 and 10)    

Remarks: 

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window.

NetLink Trust Maintenance

Date:

15 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PASIR RIS DRIVE 1 TO PASIR RIS DR 3

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Oct 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PASIR RIS DRIVE 1 TO PASIR RIS DR 3

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

10 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

253 & 254 Hougang Ave 3

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

9 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

253 & 254 Hougang Ave 3

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

9 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

80/82/84/86/88/90/92 ELIAS ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

8 Oct 2024

Time:

09:00 hrs to 15:00 hrs

Affected Exchanges/Areas:

BENCOOLEN STREET & PRINSEP STREET

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

8 Oct 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

80/82/84/86/88/90/92 ELIAS ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

4 Oct 2024

Time:

09:00 hrs to 15:00 hrs

Affected Exchanges/Areas:

SELIGIE ROAD & MACKENZIE ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

01 Oct 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

East CO  (EST OLT-07)  

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window.

September 2024

NetLink Trust Maintenance

Date:

27 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Rochor, Queen, Victoria Street 

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Science Park Drive

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

26 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

26 Sep 2024

Time:

01:00 hrs to 05:00 hrs

Affected Exchanges/Areas:

East CO  (EST OLT-09, 12) 

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window.

NetLink Trust Maintenance

Date:

25 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

81, 83 Meyer Road

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

24 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

81, 83 Meyer Road

Remarks:

All Internet and VoIP services will be affected

M1 Maintenance

Date:

24 Sep 2024

Time:

02:00 hrs to 04:00 hrs

Affected Exchanges/Areas:

Tampines CO  (TPS OLT-04, 09)   

Remarks:

All Internet and VoIP services will be affected. Users are advised to reboot their ONT/CPE/router/RG if the service is not online after the maintenance window.

NetLink Trust Maintenance

Date:

20 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

18 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

FERNVALE LINK TO FERNVALE ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

18 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date: 

18 Sep 2024

Time:

09:00 hrs to 15:00 hrs

Affected Exchanges/Areas:

Rochor, Queen, Victoria Street

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

17 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

VICTORIA STREET

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

FERNVALE LINK TO FERNVALE ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD 

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

12 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

FERNVALE LINK TO FERNVALE ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

12 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD 

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date: 

12 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

31 Tannery Lane Singapore 347788

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

11 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

FERNVALE LINK

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

11 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD 

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date: 

11 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

31 Tannery Lane Singapore 347788

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

10 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD 

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date: 

10 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Bishan St 22

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

9 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD 

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

RIVERVALE DRIVE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

5 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

991A BUANGKOK LINK TO 997A BUANGKOK CRES

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

5 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

4 Sep 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD 

Remarks:

All Internet and VoIP services will be affected

August 2024

NetLink Trust Maintenance

Date:

31 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUANGKOK CRESCENT TO BUANGKOK LINK

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

31 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SOPHIA ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

30 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUANGKOK CRES TO HG ST 91

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date: 

30 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

30 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

2 JURONG HILL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

30 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

UPPER CHANGI ROAD EAST

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

29 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BT BATOK ST 51

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

29 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

2 JURONG HILL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

28 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUANGKOK LINK

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

28 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BT BATOK ST 51

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

28 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

28 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Comcentre

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUANGKOK CRESCENT

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BT BATOK ST 51

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

Comcentre

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

27 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

ROCHOR ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

24 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

260A SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

23 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

23 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

21 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

21 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

JELLICOE RD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

20 Aug 2024

Time:

00:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

538 WOODLANDS DRIVE 16 S730538

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

20 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

20 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

20 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SOPHIA ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date: 

20 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BEDOK NORTH ST 5/ KECHIL RD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

19 Aug 2024

Time:

00:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

538 WOODLANDS DRIVE 16 S730538

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:   

19 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

UPPER CHANGI ROAD EAST

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

17 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

16 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

16 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK STREET 22

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

16 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

THOMSON ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

16 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

PUNGGOL DRIVE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

15 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

15 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK STREET 22

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

15 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

THOMSON ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Aug 2024

Time:

00:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

538 WOODLANDS DRIVE 16 S730538

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

KAMPONG JAVA ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BT BATOK WEST AVE 2

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

14 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK WEST AVENUE 8

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

PUNGGOL CENTRAL

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

KAMPONG JAVA ROAD

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK WEST AVENUE 8

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BT BATOK WEST AVE 2

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

13 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

1 SOPHIA ROAD SINGAPORE 228149

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

12 Aug 2024

Time:

00:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

538 WOODLANDS DRIVE 16 S730538

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

8 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK WEST AVENUE 3

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

8 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

991A BUANGKOK LINK TO 997A BUANGKOK CRES

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK WEST AVENUE 8

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

7 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

6 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

301D/302C PUNGGOL PLACE (824301,823302)

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

6 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

6 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK WEST AVENUE 8

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

5 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

JTC PUNGGOL DIGITAL DISTRICT

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

2 Aug 2024

Time:

00:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

538 WOODLANDS DRIVE 16 S730538

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

2 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

301D,302A,302C PUNGGOL PLACE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

2 Aug 2024

Time: 01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

2 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BUKIT BATOK WEST AVENUE 3

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

1 Aug 2024

Time:

00:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

538 WOODLANDS DRIVE 16 S730538

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

1 Aug 2024

Time:

09:00 hrs to 18:00 hrs

Affected Exchanges/Areas:

BLK 613A & 613B PUNGGOL DRIVE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

1 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

1 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

SENGKANG EAST AVENUE

Remarks:

All Internet and VoIP services will be affected

NetLink Trust Maintenance

Date:

1 Aug 2024

Time:

01:00 hrs to 06:00 hrs

Affected Exchanges/Areas:

BT BATOK ST 24

Remarks:

All Internet and VoIP services will be affected